PROJECTS
Platinum Controls is constantly expanding our profile with newly completed and ongoing projects. We pride ourselves on being diverse and completing projects of all sizes with professionalism, integrity, and high-quality workmanship.






Legacy is a green field project for the setting up of a potash production on the basis of solution mining in the south of the Canadian province of Saskatchewan. The 4 billion dollar potash solution mine has a fully integrated ABB 800xa DCS system. This system includes Profibus instrumentation, E3+ motor control & IEC61850 Power Distribution Control. Total production of the Legacy site is 2.86 Million metric tons of potash per year.

K+S- BETHUNE MINE
Dredge #2
Assemble/Commission/Start-up
Legacy is a green field project for the setting up of a potash production on the basis of solution mining in the south of the Canadian province of Saskatchewan. The 4 billion dollar potash solution mine has a fully integrated ABB 800xa DCS system. This system includes Profibus instrumentation, E3+ motor control & IEC61850 Power Distribution Control. Total production of the Legacy site is 2.86 Million metric tons of potash per year.